Custom + Fast
Your exact spec, your brand.
Framed or frameless, painted or stained, any door style, any finish, every box matched to the build. Cabo manufactures four weeks from spec lock, and your name on every carton.
See what we build →Custom cabinets for multifamily builders
A 700,000 sq ft factory in Yucatán, Mexico, devoted to manufacturing your order. Save around 25% versus US domestic on the average project, with full custom spec and delivery to every US market.
4–5
weeks
Build time
7–10
days
Delivery
100%
Custom spec
Project Planner
Enter your project, unit count and install date. The planner returns your real production and delivery schedule, the date your spec has to be locked, and a savings estimate against US domestic pricing for your unit count. Seconds, no form.
Open the Project PlannerWhy Cabo
Custom + Fast
Framed or frameless, painted or stained, any door style, any finish, every box matched to the build. Cabo manufactures four weeks from spec lock, and your name on every carton.
See what we build →Factory Direct
A real cabinet factory in Yucatán, Mexico. Not a trading desk, not a reseller. Tours are welcome, and English-speaking project managers run every account.
Tour the factory →Volume Partnership
Boutique developers and national accounts run the same line. Pricing structure, CARB and TSCA compliance, warranty in writing, and a standing relationship that knows your spec.
National Accounts →How we compare
Brutally honest. We win on speed and customization, beat US domestic on price, and beat China direct on timeline, transparency, and quality control.
| Cabo | China direct | US domestic | |
|---|---|---|---|
| Total timeline (spec to site) | 37–45 days | 70–105 days | 63–98 days |
| Savings vs US domestic | ~25% | Higher | Baseline |
| Customization | 100% custom | Limited | Full custom |
| Factory tours | Yes, English-speaking PMs | Rarely | Sometimes |
| Pre-ship quality control | Yes | After arrival | Varies |
| CARB Phase 2 / TSCA Title VI | Compliant | Varies | Compliant |
Logistics
Landlocked state? Cabo handles inland delivery to all 50 states.
Projects on the line
A sample of the work running through the Yucatán factory. Project names and photos drop in as developers clear them for publication. Numbers are real.
Build to rent, Southwest
A national BTR developer needed identical kitchens across three buildings on adjacent parcels. Cabo ran the full 412 unit cabinet package on one production lane, finished in 28 days, shipped in 11 containers across 5 trucks. Site delivery was sequenced to match drywall completion building by building.
Garden style multifamily, Southeast
Garden style multifamily, two phases delivered six months apart. Cabo held production schedule against phase one floor counts, then re-ran the same spec for phase two with zero re-engineering. The GC carried no cabinet inventory on the trailer at any point in either phase.
Senior living, Midwest
A regional senior living operator specified ADA-compliant lower cabinets across 60 percent of units. Cabo ran the ADA boxes on the same line as the standard spec, finished in 32 days, and shipped under the operator's own brand on every carton. PMs ran a video walk-through of the spec build before container load.
Want to talk to a developer running a similar project? Ask for a reference.
Answers
Short answers up front. Each one links to the full long form for the buyer who wants the depth.
About 30 days of production at the Yucatán factory once your spec is locked, then under 7 days by land to most US markets. From confirmed spec to cabinets on site is 4 to 6 weeks. Asia is 45 to 90 days just on the ocean.
Read the full answer →Around 25 percent below US domestic on the average multifamily project, with the same construction quality, full custom spec and CARB / TSCA compliance. The savings are mostly labour and logistics, not corner-cutting. Send your project and Cabo comes back with a real number.
Read the full answer →The factory is a 700,000 sq ft purpose-built cabinet plant in Yucatán with CNC lines, automated edge banding and a finishing room engineered for US compliance. Construction quality matches or beats US domestic on the same spec, with pre-ship inspection on every container.
Read the full answer →Yes. Standing capacity is around 8,000 apartment units a month, roughly 200 shipping containers. A 300 unit job is a fraction of one month. National accounts running thousands of units a year slot into a guaranteed production lane.
Read the full answer →Yes. Framed or frameless, RTA or pre-assembled, painted or stained doors in shaker, slim shaker, slab or thermofoil. Soft close hardware standard. Private label and your logo on every carton on request.
Read the full answer →Yes on both. The factory sources panels and adhesives certified to CARB Phase 2 and TSCA Title VI formaldehyde limits, and the finishing room runs water-borne coatings. Compliance documentation ships with every order.
Read the full answer →Direct by truck to most US markets. No ocean transit. Containers leaving Yucatán clear customs and arrive at job sites or warehouses across Texas, Arizona, California, the Southeast and Northeast within days. Cabo handles inland delivery to all 50 states.
Read the full answer →Send your project details. Cabo returns a quote inside 4 business hours. Lock the spec, place the deposit, and the 30 day production clock starts. Cabo coordinates delivery with your GC against your framing and drywall schedule.
Read the full answer →Looking for something else? See the complete Answers library — 100+ questions from builders, developers and procurement teams.
Send the project and Cabo comes back with a real number. Builders moving thousands of units annually should ask about National Accounts.
Maria
Cabo's assistant